Register your project details using our contact us page.
Wren manufacture all of our components in-house, allowing us to fulfil the demands of fast-moving PBSA schemes. We design & manufacture materials around site specific requirement, manufacturing bespoke product to fit the scheme. With an industry-leading 3-4 week call-off period, and our Wren on site management team overseeing the whole process, we are setting the industry standards in project delivery. Two or three stage installation to suit the programme demands are built into our processes. If an item needs replacing, we provide a 48-hour turnaround on remedial parts.
Our FIRA Gold accredited installation service includes a check measure on every plot, on-site safety management and delivery handled by our employed team members. A non-working full-time supervisor service is available where the programme and project requires it.

Register your project details using our contact us page.

You will be contacted by a member of our experienced sales team that has a thorough understanding of high-rise schemes. They will clarify the spec, specific site requirements and scope of works to ensure a compliant offer is proposed.

Our design and factory product team will work closely with the sales team to bring your project to life. Using our bespoke planning software alongside your specific project needs, we will create a proposal that is compliant whilst considering Value Engineering options. We often finalise requirements through post tender meetings and design workshops, interacting with other trades such as M&E and dry-liners.

Once everything is finalised, we will conduct a Pre-Start meeting at your site. You will have a full-time site supervisor allocated to your scheme to manage the entire process. The Pre-Start meeting addresses key health and safety considerations and project specifics, such as palletised delivery, timed access and independent H&S visits. You'll also receive a copy of our FIRA Gold-accredited installation promises, along with a site-specific risk and method statement. Benchmark plots are allocated and programmes produced to ensure on time, on budget delivery.

With the Pre-Start completed, you're ready for call-off! We will manage the process for you if there are pre-determined choices. The lead time is a maximum of 4 weeks, with every plot check measured at least once. Co-ordination between trades and programme requirements is handled completely by us.

On the day of delivery, our FORS Gold-certified fleet and employed off-loaders will deliver to the correct, secure plot. We are used to working to timed deliveries, using hoists, palletising plots or other challenging conditions. To ensure everything runs smoothly, our dedicated delivery team will visit your development before the delivery day to inspect local roads, access routes to plots, and review any specific instructions you may have.

Register your project details using our contact us page.

You will be contacted by a member of our experienced sales team that has a thorough understanding of high-rise schemes. They will clarify the spec, specific site requirements and scope of works to ensure a compliant offer is proposed.

Our design and factory product team will work closely with the sales team to bring your project to life. Using our bespoke planning software alongside your specific project needs, we will create a proposal that is compliant whilst considering Value Engineering options. We often finalise requirements through post tender meetings and design workshops, interacting with other trades such as M&E and dry-liners.

Once everything is finalised, we will conduct a Pre-Start meeting at your site. You will have a full-time site supervisor allocated to your scheme to manage the entire process. The Pre-Start meeting addresses key health and safety considerations and project specifics, such as palletised delivery, timed access and independent H&S visits. You'll also receive a copy of our FIRA Gold-accredited installation promises, along with a site-specific risk and method statement. Benchmark plots are allocated and programmes produced to ensure on time, on budget delivery.

With the Pre-Start completed, you're ready for call-off! We will manage the process for you if there are pre-determined choices. The lead time is a maximum of 4 weeks, with every plot check measured at least once. Co-ordination between trades and programme requirements is handled completely by us.

On the day of delivery, our FORS Gold-certified fleet and employed off-loaders will deliver to the correct, secure plot. We are used to working to timed deliveries, using hoists, palletising plots or other challenging conditions. To ensure everything runs smoothly, our dedicated delivery team will visit your development before the delivery day to inspect local roads, access routes to plots, and review any specific instructions you may have.

Our dedicated Contracts design team understand how to deliver aspirational designs on budget and to precise specification.

Our brand new 3m+ sq. ft. purpose-built, manufacturing facility and best-in-class lead times mean we are becoming the manufacturer of choice in the Contracts market.

We are used to fast moving high-rise schemes as well as traditional regional housebuilding developments and our mission is to deliver the quality we expect, on-time and on-budget.

Dedicated, experienced, single-point project management throughout the entire process to ensure our involvement in your build process runs smoothly and to your expectations.

All of our products are quality-control checked at our UK-based factories, scanned out of the factory, into the truck and out of the truck into your plot to ensure you’re not missing any items on the day of installation.
On the day of installation, our BIFIS Approved Installation Team will arrive in line with the pre-start guidance to commence our FIRA Gold Installation Service supported by our dedicated Installation Manager. Once the installation is complete, the installer will carry out a post installation check from left to right prior to approaching the site team for sign off. Once signed off, the kitchen will be carefully wrapped to protect the frontals and worktops.


We’re pleased to have recently partnered with the NBS. For more information and to view our listing, please click below.
More infoOur Contracts team is based across the UK, including our dedicated office in Chiswick, West London. Get in touch to discuss your next development.