Fast-moving high-rise schemes with specific requirements are what we do every day. With an industry-leading 3-4 week call-off period, and thorough on site management of the whole process, we’re setting the industry standards in project delivery. Two or three stage installation to suit the programme demands are built into our processes. If an item needs replacing, we provide a 48-hour turnaround on remedial parts.

Our FIRA Gold accredited installation service includes a check measure on every plot, on-site safety management and delivery handled by our employed team members. A non-working full-time supervisor service is available where the programme and project requires it.

The process

step12

Register

Register your project details using our contact us page. 

Image

Consultation

You will be contacted by a member of our experienced sales team that has a thorough understanding of high-rise schemes. They will clarify the spec, specific site requirements and scope of works to ensure a compliant offer is proposed.

Image

Realisation

Our design team will work closely with the sales team to bring your project to life. Using our bespoke planning software alongside your specific project needs, we will create a proposal that is compliant whilst considering Value Engineering options. We often finalise requirements through post tender meetings and design workshops, interacting with other trades such as M&E and dry-liners.

Wren-Contracts_Bayer-House_Installation-Manager_Installer_Talking

Pre start

Once everything is finalised, we will conduct a Pre-Start meeting at your site. If appropriate you will be allocated a full-time site supervisor for your scheme to manage the entire process. The Pre-Start meeting addresses key health and safety considerations and project specifics, such as palletised delivery, timed access and independent H&S visits. You'll also receive a copy of our FIRA Gold-accredited installation promises, along with a site-specific risk and method statement.

Image

Call off

With the Pre-Start completed, you're ready for call-off! We'll provide a site-specific call-off sheet for your development, or we will manage the process for you if there are pre-determined choices. The lead time is a maximum of 4 weeks, with every plot check measured at least once. Co-ordination between trades and programme requirements is handled completely by us.

Image

Delivery

On the day of delivery, our FORS Gold-certified fleet and employed off-loaders will deliver to the correct, secure plot. We are used to working to timed deliveries, using hoists, palletising plots or other challenging conditions. To ensure everything runs smoothly, our dedicated delivery team will visit your development before the delivery day to inspect local roads, access routes to plots, and review any specific instructions you may have.

The process

  • Wren-Contracts_Bayer-House_Installation-Manager_Installer_Talking
    Corem

    Design

    Our dedicated Contracts design team understand how to deliver aspirational designs on budget and to precise specification.

  • HighRes_WrenKitchens_InstallationNewbury-16
    Porem

    Manufacture

    Our brand new 3m+ sq. ft. purpose-built, manufacturing facility and best-in-class lead times mean we are becoming the manufacturer of choice in the Contracts market.

  • Wren-Contracts_Clifton-Rd-050224_edited-10
    Corem

    Install

    We are used to fast moving high-rise schemes as well as traditional regional housebuilding developments and our mission is to deliver the quality we expect, on-time and on-budget.

  • Image
    Corem

    Management

    Dedicated, experienced, single-point project management throughout the entire process to ensure our involvement in your build process runs smoothly and to your expectations.

s5

Quality

All of our products are quality-control checked at our UK-based factories, scanned out of the factory, into the truck and out of the truck into your plot to ensure you’re not missing any items on the day of installation.

Installation

On the day of installation, our BIFIS Approved Installation Team will arrive in line with the pre-start guidance to commence our FIRA Gold Installation Service supported by our dedicated Installation Manager. Once the installation is complete, the installer will carry out a post installation check from left to right prior to approaching the site team for sign off. Once signed off, the kitchen will be carefully wrapped to protect the frontals and worktops.

Due to the volume of installations that may be taking place across a high-rise project, we add an additional sign off that allows your site team to complete a floor sign off with your Installation Manager, for added peace of mind.

image

We’re pleased to have recently partnered with the NBS. For more information and to view our listing, please click below.

More info
car-icon2x
Delivery

Our award-winning and flexible delivery service is fully operated and owned by Wren. Replacements will be with you in as little as 48 hours.

draw-icon2x
Fully built

Our kitchens are fully built to the highest specification in our state-of the-art UK manufacturing facilities.

support-icon2x
Fully supported

Your project will be managed from point of tender through to point of completion. Our experienced team will be there to assist you throughout your project.

factory-icon2x
Made in the UK

Every step of our manufacturing process happens in the UK. This means we can keep a careful eye on everything we do, keep costs low and quality high.

enquiries

Get in touch

Our Contracts team is based across the UK, including our dedicated office in Chiswick, West London. Get in touch to discuss your next development.

Make an enquiry
Chiswick_Showroom_Image